Ext Gantt Changelog

Release history for Ext Gantt

Version 5.1.14, 2018-05-01

SUPPORTED EXT JS VERSIONS

  • 6.5.1
  • 6.5.3

KNOWN ISSUES

  • Note column is not supported in FireFox #4412.

BUG FIXES

  • Fixed #4570: Problem DynamicAssignment mode in combination with Resource Calendar
  • Fixed #5201: A milestone cannot be dragged to start on Monday
  • Fixed #5408: Milestone dependency disappears after dragging the milestone
  • Fixed #6048: Crash when setting calendar for segmented task
  • Fixed #6057: Wrong rendering if making last segment 0 duration
  • Fixed #6058: Drag proxy misplaced if drop is async
  • Fixed #6073: Must Finish On violation when changing duration
  • Fixed #6074: Selection model works incorrectly when selecting rows with CTRL

Version 5.1.13, 2018-04-10

SUPPORTED EXT JS VERSIONS

  • 6.5.1
  • 6.5.3

KNOWN ISSUES

  • Note column is not supported in FireFox #4412.

BUG FIXES

  • Fixed #5804: Start-To-Finish dependency is not honored
  • Fixed #5805: Finish-To-Finish dependency is not honored
  • Fixed #5839: Upgrade Issue
  • Fixed #5911: Progressline crashes on adding childNodes
  • Fixed #5943: Early start/end dates are cleared when certain constraint type is set

Version 5.1.12, 2018-02-16

SUPPORTED EXT JS VERSIONS

  • 6.5.1
  • 6.5.3

KNOWN ISSUES

  • Note column is not supported in FireFox #4412.
  • Added support for Ext JS 6.5.3

BUG FIXES

  • Fixed #4840: Task should start before the project start date on SF dependency creation
  • Fixed #5134: Project nodes should not recalculate its start date
  • Fixed #5597: Copying a resource multiple times to other tasks
  • Fixed #5745: Maximum call stack size exceeded after task indent

Version 5.1.11, 2018-02-08

SUPPORTED EXT JS VERSIONS

  • 6.2.1
  • 6.5.1
  • 6.5.2

KNOWN ISSUES

  • Note column is not supported in FireFox #4412.

BUG FIXES

  • Fixed #5537: Gantt view is scrolled incorrectly on task drag drop
  • Fixed #5568: Task drag drop should not start view vertical scroll when `outOfRowTaskDragDrop` is false
  • Fixed #5621: addTaskAbove / addTaskBelow – Index of next task incorrect
  • Fixed #5655: Patch for spreadsheet navigation focus bug
  • Fixed #5660: Add xtype config for notefield picker
  • Fixed #5682: Dependency tooltip misplaced
  • Fixed #5690: Must-Start-On / Must-Finish-On constraints cannot be set on weekends

Version 5.1.10, 2018-01-10

SUPPORTED EXT JS VERSIONS

  • 6.2.1
  • 6.5.1
  • 6.5.2

KNOWN ISSUES

  • Note column is not supported in FireFox #4412.

BUG FIXES

  • Fixed #5101: Tasks are not draggable when dropped on indicator
  • Fixed #5135: Check milestone methods consistency
  • Fixed #5258: MSProject import demo doesn’t load root node
  • Fixed #5311: Split task gets corrupted after drag drop
  • Fixed #5329: Split task renders wrong after drag drop using custom task calendar
  • Fixed #5393: Exception in spreadsheet model when column is selected and hidden from header
  • Fixed #5397: Crash after undo: Cannot read property ‘getCalendar’ of null
  • Fixed #5407: Milestone Late Finish date is less than Late Start date
  • Fixed #5409: Unexpected dependency violation dialog shows up
  • Fixed #5464: Show decimal digits by default in PercentDone column

Version 5.1.9, 2017-11-30

SUPPORTED EXT JS VERSIONS

  • 6.2.1
  • 6.5.1
  • 6.5.2

KNOWN ISSUES

  • Note column is not supported in FireFox #4412.

FEATURES / ENHANCEMENTS

  • Added French locale (Fixed #4945).
  • Inline style can be passed to baseline element from `eventRenderer` (Fixed #5132).
  • The Gantt is switched to use for the lag, the calendar of the successor (Fixed #5219). To switch back to previous behavior please see `dependenciesCalendar` config in the docs.
  • `sch-panelgantt-showbaseline` CSS class is renamed to `sch-viewgantt-showbaseline` and is now applied to the Gantt scheduling view element instead of the Gantt panel element.
  • Added a new guide describing Ext Gantt integation with SharePoint, you’ll find it in the online documentation.
  • Added a new demo, which implements import from MS Project using a .NET backend (Fixed #683).

BUG FIXES

  • Fixed #2379: Rollup milestones not aligned horizontally
  • Fixed #3295: Possible to use drag creator on empty parent task
  • Fixed #3834: Add CSS styling for calendar days in date pickers
  • Fixed #4587: rowHeight should do a mininum check instead of putting it on 60
  • Fixed #5024: Calendar cache doesn’t get updated
  • Fixed #5068: Cannot read property ‘value’ of null
  • Fixed #5090: TreeViewDragDrop is not autoscrolling when using dragcolumn
  • Fixed #5102: Calendar Manager doesn’t cleanup calendars removed on the server
  • Fixed #5131: Parent task % completion is calculated incorrectly
  • Fixed #5145: Draggable tasks in the locked side have no “invitation” to drag.
  • Fixed #5150: Add new resource in Task editor dialog shows resource id instead of name
  • Fixed #5178: Gantt doesn’t align a new successor properly after undo
  • Fixed #5180: Percent Done shown as 100% even if raw value is 99.999
  • Fixed #5192: Regression: Calendar column shows id instead of name
  • Fixed #5207: Calendar overrides: Should not warn about existing day override when blurring date editor without change
  • Fixed #5210: Dependencies are duplicated when showing baselines
  • Fixed #5213: Invalid task size with showExactDropPosition: true
  • Fixed #5218: Dependency lag is calculated incorrectly
  • Fixed #5227: Date copied incorrectly when column uses d/m/Y format

Version 5.1.8, 2017-10-25

SUPPORTED EXT JS VERSIONS

  • 6.2.1
  • 6.5.1
  • 6.5.2

KNOWN ISSUES

  • Note column is not supported in FireFox #4412.

FEATURES / ENHANCEMENTS

  • New ‘indicators’ demo showing how to add custom elements to the Gantt timeline

BUG FIXES

  • Fixed #5076: Crash when hovering timeline task
  • Fixed #5082: eventRenderer return value overwrites internally used values of ‘cls’ and ‘ctcls’

Version 5.1.7, 2017-10-24

SUPPORTED EXT JS VERSIONS

  • 6.2.1
  • 6.5.1
  • 6.5.2

KNOWN ISSUES

  • Note column is not supported in FireFox #4412.

BUG FIXES

  • Fixed #5032: Resizing not working in Chrome
  • Fixed #5035: Resizing a task changes its height
  • Fixed #5062: Calendar editor shows empty text when editing.
  • Fixed #5059: Task with empty Name shows ‘Root’ in tree column

Version 5.1.6, 2017-10-18

SUPPORTED EXT JS VERSIONS

  • 6.2.1
  • 6.5.1

KNOWN ISSUES

  • Note column is not supported in FireFox #4412.

BUG FIXES

  • Fixed #3847: Should not collapse / expand task on interaction with dependency setup
  • Fixed #4640: Timeline cuts milestone’s label at end of timeline component
  • Fixed #4927: Gnt.patches.SelectionExtender2 patch breaks non-locked grids
  • Fixed #4930: Timeline headers not aligned with tasks

Version 5.1.5, 2017-10-03

SUPPORTED EXT JS VERSIONS

  • 6.2.1
  • 6.5.1

KNOWN ISSUES

  • Note column is not supported in FireFox #4412.

FEATURES / ENHANCEMENTS

  • The resource histogram now calculates a weighted average of allocation % in case this value changes in the middle of a day.

BUG FIXES

  • Fixed #1620: % complete ignored in Milestone
  • Fixed #3819: Planning container is 100% done when it’s children are not all 100% done
  • Fixed #3936: Assignments not available if listening for ‘afteredit’
  • Fixed #4845: Histogram gap in bars when new task starts
  • Fixed #4847: Add new column not working as expected
  • Fixed #4857: Can’t sort resource assignment grid name column
  • Fixed #4866: Dependency lines missing
  • Fixed #4902: Changes in label editor are not saved on click on normal view

Version 5.1.4, 2017-09-15

SUPPORTED EXT JS VERSIONS

  • 6.2.1
  • 6.5.1

KNOWN ISSUES

  • Note column is not supported in FireFox #4412

FEATURES / ENHANCEMENTS

  • Fixed an issue where sorting a task store would trigger tasks to be synced.

BUG FIXES

  • Fixed #4416: Crash when trying to indent project node
  • Fixed #4666: Export plugin docs: a screenshot is too big
  • Fixed #4699: Wrong row selected after right click after deleting a row
  • Fixed #4781: Dependency lines are misplaced for milestone with greater row height
  • Fixed #4782: Advanced sample: Sequence column has duplicate values after adding a task
  • Fixed #4784: Milestone is placed incorrectly with high rows
  • Fixed #4796: After first out of row drop helper elements do not show future task position
  • Fixed #4798: Reordering items doesn’t work when rendering to a div
  • Fixed #4801: Crash after task drag drop while histogram is resource-filtered
  • Fixed #4809: Crash after drag drop in Assigning Resources demo