Hi!
Here's an example:
- Load the Advanced Demo
- Scroll the timeline to the right 10 times using the button in the toolbar.
- Select the task in the 4th row and click edit in the toolbar
Result:
- The timeAxis is scrolled back to the task startDate
This is nice for small charts, but when doing batch editing in charts with hundreds of tasks, this can get a bit annoying.
This is clearly by design, but I was wondering if a flag could be added to https://www.bryntum.com/docs/gantt/#Gantt/feature/TaskEdit#function-editTask so we could specifically tell it not to scroll the event into view?
Thanks!