Hi
Regarding our POST "Demo is missing too many features..."
We would like to know if you can improve the "Advanced Demo" so as to add an extra option in contextMenu (Grid or Schedule) or in the ToolBar in order to create on a fly "Parent" and/or "Child" item.
Indeed, from the "Advanced Demo" it is impossible to create a parent Task or "Summary Task".
Nonetheless, we believe this is something quite easy for you since the dataStore comprises fields such as :
"isParent" & "isLeaf" which allow creating any type of item as a "Parent" or "Child".
Then, once the "Parent" is in the place, HOW to add a child in it?
1) Why not activating the Drag & Drop (from the Grid) so as to Drag one or several items and drop then over a Parent. (I said OVER because this is the best way to listen if the Drop occurs under, above or over an item)
2) Why not, from Grid (rows) having a contextMenu for each item with 2 options :
a) Indent (that will make the selected item to be a child of the Task above which become a Parent if not
b) unindent (Depending on the hierarchy level, but the selected item could become either a Parent or the Child to another Branch...)
Those are 2 possibilities we listed to create "Parent" or "Child" in user-friendly way. Of course, there are many other ways...
Your demo is almost perfect but it is missing these 2 important functionalities to build a Gantt.
As it is obvious that you know how WBS works, we believe this should be a big deal to set this up
Support Forum
Hi
Just want to say thank you...
Indeed, the upcoming new release of the Gantt has introduced, something we have requested, out of the forum, which is easing the Gantt handling by adding basic function such "Add Task / Milestone / Parent..."
As a matter of fact, having downloaded the nightly build Gantt.1.x-2019-05-23, in order to highlight an issue with the new Scheduler 2.0.3, we have been really happy to see (look at the screenshot) a very useful function
Thank you guys. We are looking forward to getting the final release. (just to small detail to fix see the attachment)
Just want to say thank you...
Indeed, the upcoming new release of the Gantt has introduced, something we have requested, out of the forum, which is easing the Gantt handling by adding basic function such "Add Task / Milestone / Parent..."
As a matter of fact, having downloaded the nightly build Gantt.1.x-2019-05-23, in order to highlight an issue with the new Scheduler 2.0.3, we have been really happy to see (look at the screenshot) a very useful function
Thank you guys. We are looking forward to getting the final release. (just to small detail to fix see the attachment)
- Attachments
-
- Capture d’écran 2019-05-23 à 21.33.51.png (71.74 KiB) Viewed 2256 times
-
- Capture d’écran 2019-05-23 à 21.35.20.png (124.81 KiB) Viewed 2256 times
As said in one of our post in the Schedule section, we simply have merged both app you send us "Scheduler" & "Gantt" under VueCLI. Our Test app includes both Scheduler 2.0.3 and the Nightly Gantt 1.X-2019-05-23.
We add another attachment that shows another issue with the Gantt.
When trying to resize using the separator then Gantt Chart gets shrunk...
We add another attachment that shows another issue with the Gantt.
When trying to resize using the separator then Gantt Chart gets shrunk...
- Attachments
-
- Capture d’écran 2019-05-23 à 22.05.54.png (181.48 KiB) Viewed 2254 times