Hello everyone,
I am using the schedulerPro( v 4.3.5) .
I want to annuler the limit of the time when 2 events are linked by the dependency. Fore more detail, in the attachment, I have 2 events(event1 and event2). Do we have the attribute for enabling moving the event2 before event1.
[
{
"id": 1,
"fromEvent": 285905,
"toEvent": "285906"
}
]